1.We are able to make customization for the design you want.
2. Audit: BSCI, SEDEX, ICS etc.
3. Normally, the sample lead time about 8-10 days, mass production lead time about 30-45days according your order quantity.
Warm reminder and storage instructions:
1. Before filling the flask for the first time, rinse the inside with clean soapy water.
2. After use, the flask must be emptied. Do not keep spirits, high temperature liquid, and acid for a long time. And rinse it before refilling.
3. Don't let the alcohol stay in the bottle for more than three days. Wash and keep dry before storage.